GoldHot
GoldHot

Direct contact

support@goldhottowelwarmer.com+86 188 2417 8258 · WhatsAppSign in · Buyer Portal
Model 23 of 32

The Z

1819Z

Z-edition of the 1819, a redesigned 20L bucket-style electric towel warmer with thinner cable management and a refined handle, same dependable internals.

Wholesale price · FOB Shenzhen

From $26.5/unit

At 1,000-pc tier · MOQ 200

Available in

White

1819Z
+2 more

Frame 01 / 10

Specifications

Every measure,
recorded.

The 1819Z is the 2024 refresh of the 1819 platform. A 20L bucket cavity unchanged, but the chassis was retooled to flatten the back panel by 8 mm, route the power cable internally, and add a side-mounted handle that the original lacked. Same continuous-duty PTC heater, same twelve certifications. The model retailers spec when they want the 1819 reliability behind a tidier installed look on the bathroom floor.

01Capacity20 L
02Power190 W
03EditionZ 2024
04CableHidden
Certified · 2 marks
CEETL
Every Angle

10 frames, one warmer.

Each unit photographed in our Guangdong studio. Hover any frame to enlarge.

1819Z frame 101 / 10
1819Z frame 202 / 10
1819Z frame 303 / 10
1819Z frame 404 / 10
1819Z frame 505 / 10
1819Z frame 606 / 10
1819Z frame 707 / 10
1819Z frame 808 / 10
1819Z frame 909 / 10
1819Z frame 1010 / 10
In Residence

Warm towels.
Quiet rooms.

The 1819Z is engineered for the bath that earns its silence, under 35 dB at peak. No fan whine. No click. Just a soft glow and a warm towel waiting.

Cycle

60 min

Power

190 W

1819Z in residence

Specifications

1819Z, engineering reference

Power rating120 W typical (60-200 W range)
Voltage110V / 220V dual-voltage
Surface temp50-55°C (factory cap; 45°C variant available)
Warm-up time8-15 minutes from cold to operating temperature
Categoryseparable
CertificationsETL · UL · CE · FCC · RoHS · PSE · UKCA · CA65
Warranty5 years on commercial-grade, 2 years on residential
MOQ200 units per SKU
Download spec sheet (PDF)Or the full catalogue

Specs are subject to certification scope per market. Final values confirmed with your project manager before tooling lock.